The Town of Oakboro operates its own Regional Wastewater
Treatment Plant (WWTP) located 2.5 miles outside of Town limits on Barbee’s Grove Road. It is an activated sludge process plant with a permitted flow of 900,000 gallons per day. The WWTP accepts and treats a waste stream from three wastewater collection systems: Oakboro, Locust and Stanfield. |
|
 |
The WWTP monitors for 16 permitted characteristics
whereas 7 of these are conducted in house at our State Certified Laboratory.
These parameters include Flow, Dissolved Oxygen, Temperature, Fecal Coliform,
Ammonia, and pH just to name a few. A full list may be obtained from the
NCDENR Mooresville Regional Office. |
|
The treated wastewater is discharged into Rocky
River. The by-product of the treatment process, also known as bios
lids,” is handled and stored on-site, removed and land applied,
utilizing its high concentrations of Nitrogen and Phosphorus as a
fertilizing agent. David Nichols is the ORC of the Waste Water treatment.
Read the 2011 Performance Review here-->
2011. |
|
For the year 2001, this facility handled and treated 66
million gallons of wastewater, and land applied 247,000 gallons of bios lids
over 35.6 acres. Nick Griffin is the backup ORC of the wastewater collection system. |
 |